ANTICIPATED WORK FOR THE WEEK OF JULY 26, 2010

Burlington

Road construction will reduce traffic to one lane at times on the following Burlington streets:

  • South Prospect from Maple to Ledge Drive
  • Conger Avenue
  • Marion Street
  • Harrison Avenue
  • Ledgemere Street
  • Jackson Court
  • Harrington Terrace
  • Main Street from Battery to St. Paul
  • Pine Street from Maple to Bank
  • Pine Street from Pearl to Cherry
  • St. Paul from Bank Street to College
  • St. Paul from Pearl to Cherry
  • George Street
  • Peru Street
  • Margaret Street

Colchester

Motorists should be aware of large equipment on the edge of the roadway in the area of Church Road and Holy Cross Road during the week. Traffic control will be present.

Essex

Sidewalk construction on Route 15 eastbound between Sunset Drive to the Price Chopper Plaza entrance will cause lane closures and occasional traffic delays. Traffic control is present, and this project should be completed by Sept. 1.

Essex Junction

Work on Pearl Street between the main gate of the fairgrounds and the intersection with the post office will last through Nov. 1. Most of the work will be between 7 a.m. and 6 p.m., with occasional night work possible. Two-way traffic will be maintained at all times with traffic control present.

Interstate 89

Drivers should be aware of construction activity near the exit 14W northbound ramp. Uniformed traffic officers are stationed on the ramp and in the shoulder area.

Work to improve the exit 15 northbound ramp on I-89 in Winooski will cause traffic delays. Late in the week, crews may relocate concrete barriers and change traffic patterns. Motorists are advised to use alternate routes if possible.

Jericho

Sidewalk construction on Route 15 from Lawrence Heights to Griswold Street will cause periodic lane closures through September.

South Burlington

Traffic on White Street from Airport Parkway to Williston Road will be delayed due to work on a water line. Traffic will be maintained, but motorists should expect delays and avoid the area if possible.

Motorists should be aware of construction vehicles entering and leaving the main entrance to Holiday Inn on Williston Road during the day.

Road construction on San Remo Drive will reduce traffic to one lane at times.

Underhill

Pleasant Valley Road from Mountain Road to New Road will be closed to ALL traffic starting through Aug. 3. It will reopen on Aug. 4. The road will NOT reopen at night in order to complete the reconstruction of the road faster and more efficiently. Alternate routes include Irish Settlement or Lower Valley Road to Route 15 in Cambridge.

Westford

Roadwork in Westford Village proceeding to the intersection of Vermont Routes 128 and 104 will cause lane closures and short traffic delays. Traffic flow will be maintained with traffic control present. Motorists should use extreme caution while traveling through the work zone. This project is expected to be completed by Sept. 12.

County-wide

Motorists should be alert for bridge washing and mowing along all county roads. Minor traffic delays should be expected.

For additional information, contact Administrative Advantage at 802-872-9757. More information on current activities at the Chittenden County Metropolitan Planning Organization is available online at www.ccmpo.org.