July 25, 2017

Riding for Camp Ta-kum-ta

Six intrepid drivers with two riders leave from Roadside Motorsports in Williston to RIde for Camp Takumta on Saturday the 8th. Takumta representatives Karen (L) and Bailey Reilly stand with the group.

Six intrepid drivers with two riders leave from Roadside Motorsports in Williston to RIde for Camp Takumta on Saturday the 8th. Takumta representatives Karen (L) and Bailey Reilly stand with the group.

Six intrepid drivers with two riders leave from Roadside Motorsports in Williston to RIde for Camp Takumta on Saturday the 8th.

Six intrepid drivers with two riders leave from Roadside Motorsports in Williston to RIde for Camp Takumta on Saturday the 8th.

Comments

  1. tcoletta says:

    almost 3 decades ago when williston started it’s development review process the public works section was pushing for a wider roadway typical for residential streets. The town adopted 30 ft widths vs 24ft. That’s 6/24 (30%) additional impervious area and runoff that needs to treated before flowing into ALLEN BROOK. The town and selectboard have indicated a lack of interest to reach out and help communties like mine that have had expired stormwater permits for more then a decade. Its always been a wait and see, well I see where this headed now.

Speak Your Mind